>首页 > Project > OverSea Project >

Saudi Arabia SABIC 120000 tons/year butene project

admin  2010-11-26   
  The installation height of the Saudi SABIC 120000 tons/year butene project is high, with a maximum height of 90 meters; There is a large amount of on-site installation of equipment components, with 450 layers of trays and fasteners installed for two towers in Zone 35. The amount of work in enclosed spaces is high, and HSE management is difficult; The process pipeline has a large quantity and a short construction period. The process pipeline is 140000 inches long. Except for the pipe gallery, the installation of other areas began gradually in September 2008. Pressure testing began in October 2008 and was basically completed by the end of February.
  Main physical quantities: 1424 tons of steel structure, 73 tons of dynamic equipment, 830 tons of static equipment, and 140000 inches of process pipelines. Construction period: February 2008 to June 2009.


Saudi Arabia SABIC 120000 ton Butene Plant Polypropylene Panorama


Aerial View of YANSAB Petrochemical Industrial City Site of Saudi Arabia SABIC 120000 ton Butene Plant


Saudi Arabia SABIC installs fire protection line for 120000 ton butene plant


Saudi Arabia SABIC 120000 ton Butene Plant Butene Pipe Gallery


Saudi Arabia SABIC 120000 ton Butene Plant Butene Tower and Framework


Saudi Arabia SABIC 120000 ton Butene Plant Scaffold


Saudi Arabia's SABIC 120000 ton butene plant is in place


Saudi Arabia SABIC 120000 ton Butene Plant Tower Group


Saudi Arabia SABIC 120000 ton Butene Plant Main Pipeline Corridor Area


A corner of Saudi Arabia SABIC's 120000 ton butene plant


 
Contact Us
Shengyue Middle East Co., Ltd.
Jin Wenlin,
General Manager,
Shengyue Middle East Co., Ltd.(SMEC)
CR NO.2051041620
Telephone:00966 3 8146 711
Fax:00966 3 8146522
Mob:+966 55 6006 729 (KSA)
    +86 135 8950 8858 (CHN)
E-mail:jinwenlin@yahoo.cn
Homepage:http://www.sypec.com.cn
Address:Crysantenpad 4# ,Eurovillage,
P.O.Box1682, Al Khobar 31952, KSA