>首页 > Project > Classical Project >

Luoyang wax oil hydrogenation to medium pressure hydrocracking project

sypecadmin  2025-07-24   
  The conversion of Luoyang wax oil hydrogenation to medium pressure hydrocracking project is located within the original 2.2 million tons/year hydroprocessing and 40000 standard cubic meters/hour hydrogen production joint unit plan, mainly utilizing the original hydroprocessing land and partially utilizing the land of the hydrogen production unit for renovation. The unit started construction in September 2020 and was handed over on September 30, 2021.


Overview of 2.2 million ton annual medium pressure hydrocracking unit


2.2 million ton annual medium pressure hydrocracking unit R5101 reactor hoisting


2.2 million ton annual medium pressure hydrocracking unit T5101 hoisting


Main pipe gallery in the renovation of 2.2 million ton annual medium pressure hydrocracking unit

 

Contact Us
Shengyue Middle East Co., Ltd.
Jin Wenlin,
General Manager,
Shengyue Middle East Co., Ltd.(SMEC)
CR NO.2051041620
Telephone:00966 3 8146 711
Fax:00966 3 8146522
Mob:+966 55 6006 729 (KSA)
    +86 135 8950 8858 (CHN)
E-mail:jinwenlin@yahoo.cn
Homepage:http://www.sypec.com.cn
Address:Crysantenpad 4# ,Eurovillage,
P.O.Box1682, Al Khobar 31952, KSA
Link