>首页 > Project > Classical Project >

Zhongke Refining and Chemical Integration Project

sypecadmin  2025-07-24   
  The EPC1-B2 section of the installation project for the Zhongke Refining and Chemical Integration Project is under the general contracting of Sinopec Luoyang Engineering Co., Ltd., including a 10 million ton/year atmospheric and vacuum distillation unit and a 2 million ton/year young hydrocarbon recovery unit. The installation project of EPC3-B6 section (tank area) is under the general contracting of Sinopec Luoyang Engineering Co., Ltd., including: A-302 chemical raw material tank area, A-304 intermediate raw material tank area for steam, coal, and diesel, A-309 gasoline component tank area, A311 liquefied petroleum gas tank area, A312 dirty oil tank area, A313 aromatic hydrocarbon tank area, A-331 gasoline blending and 11 units including 2 # and 3 # substations, 11 # and 12 # cabinet rooms.




Panoramic view of 10 million tons annual atmospheric and vacuum distillation unit


Night view of a 10 million ton annual atmospheric and vacuum distillation unit


System supporting diesel tank area


System supporting aromatic hydrocarbon tank area


System supporting tank liquefied gas tank area


Panoramic view of the system's supporting tank area


10 million ton annual atmospheric and vacuum distillation unit handover ceremony

 

Contact Us
Shengyue Middle East Co., Ltd.
Jin Wenlin,
General Manager,
Shengyue Middle East Co., Ltd.(SMEC)
CR NO.2051041620
Telephone:00966 3 8146 711
Fax:00966 3 8146522
Mob:+966 55 6006 729 (KSA)
    +86 135 8950 8858 (CHN)
E-mail:jinwenlin@yahoo.cn
Homepage:http://www.sypec.com.cn
Address:Crysantenpad 4# ,Eurovillage,
P.O.Box1682, Al Khobar 31952, KSA
Link