Sinopec Qilu Branch CFB Boiler Flue Gas Ultra Clean Emission Technology Renovation Project
sypecadmin 2016-08-12
The Sinopec Qilu Branch CFB Boiler Flue Gas Ultra Clean Emission Technology Transformation (Second Chemical Power Station) Project (referred to as the "Second Chemical Power Station Ultra Clean Emission Transformation Project") is located in the CFB Boiler Workshop of Qilu Second Fertilizer Plant. The bag filter dust removal device of the original equipment is dismantled, and this project is newly built on the original basis. The renovation project includes three sets of 2.4 million tons/year CFB boiler desulfurization systems and COA denitrification systems, covering an area of approximately 5600 square meters, including a building area of 394.53 square meters. The project contract period is from July 15, 2016 to November 30, 2017.
![]() Reinforcement binding of bag filter foundation ![]() The foundation concrete of the bag filter has been poured ![]() Excavation of foundation for bag filter ![]() The foundation cushion layer of the desulfurization island has been constructed and the steel bars have been tied ![]() The construction of the lime soil cushion layer for the desulfurization island foundation has been completed ![]() Backfilling of desulfurization island foundation ![]() The concrete pouring for the foundation ring beam of the new air compressor has been completed ![]() New air compressor foundation bricklaying completed |