Huaxing 1 million tons/year catalytic gasoline hydrogenation unit light gasoline unit

sypecadmin  2011-04-26   
  The light gasoline unit of the 1 million tons/year catalytic gasoline hydrogenation unit newly built by Shandong Huaxing Petrochemical Group Co., Ltd. was designed by Dalian Chemical Design Institute, supervised by Shandong Jinkeyi Engineering Supervision Co., Ltd., and constructed by Shandong Shengyue Petrochemical Engineering Construction Co., Ltd.
  The device is arranged in a north-south direction, divided into three areas in an east-west direction. The west side is the reaction and furnace area, the frame area, and the tower area from north to south, the middle is the device pipe gallery and pump area, and the east side is the compressor area. The device is 70 meters long from north to south and 50 meters wide from east to west, covering an area of approximately 3500 square meters. The north side of the device is adjacent to the air compression station, the west side is the cooling water tower, the south side is the tank area, and the east side is the hydrogenation device.
  The construction scope includes all installation works except for civil engineering and heating furnaces, including steel structures, process pipelines, water supply and drainage and fire protection, dynamic and static equipment, electrical, instrumentation, anti-corrosion, insulation, fire protection layer, and non-destructive testing. The main physical quantities of the project are: approximately 360 tons of steel structure, approximately 6 kilometers/30000 inches of process pipelines, approximately 1 kilometer/3000 inches of underground pipelines, 14 pumps, 3 reciprocating compressors, 6 air coolers, 2 sets of air coolers, 2 towers, 2 reactors, 14 containers, 18 heat exchangers, approximately 2 kilometers of electrical cables, approximately 300 sets/sets of electrical equipment, approximately 3.5 kilometers of instrument cables, approximately 500 sets/sets of instrument equipment, approximately 60000 square meters of anti-corrosion, approximately 120 cubic meters of insulation, and approximately 40 cubic meters of fire protection layer.
  The construction period of the device is from February 2011 to June 2011.


Future prospects of the light gasoline unit in Huaxing's 1 million ton annual catalytic gasoline hydrogenation unit


Construction of Light Gasoline Single Tube Gallery Frame for Huaxing 1 Million Tons Annual Catalytic Gasoline Hydrogenation Unit


Installation of light gasoline unit pump for Huaxing 1 million ton annual catalytic gasoline hydrogenation unit


Installation of tower attached pipeline for light gasoline unit of Huaxing 1 million ton annual catalytic gasoline hydrogenation unit


Construction of Light Gasoline Unit Pipe Rack for Huaxing 1 Million Tons Annual Catalytic Gasoline Hydrogenation Unit


Pipeline laying of light gasoline unit in Huaxing 1 million ton annual catalytic gasoline hydrogenation unit


Construction of Light Gasoline Unit Framework for Huaxing 1 Million Tons Annual Catalytic Gasoline Hydrogenation Unit


Overview of the Light Gasoline Unit in Huaxing's 1 Million Tons Annual Catalytic Gasoline Hydrogenation Unit

Lifting of Light Gasoline Unit Equipment for Huaxing 1 Million Tons Annual Catalytic Gasoline Hydrogenation Unit
 
Construction of the foundation for the light gasoline unit equipment of Huaxing's 1 million ton annual catalytic gasoline hydrogenation unit
 

Construction of the Light Gasoline Unit Tower Joint Platform for Huaxing's 1 Million Tons Annual Catalytic Gasoline Hydrogenation Unit


Lifting of the stabilizer tower for the light gasoline unit of Huaxing's 1 million ton annual catalytic gasoline hydrogenation unit


 

Contact Us
Shengyue Middle East Co., Ltd.
Jin Wenlin,
General Manager,
Shengyue Middle East Co., Ltd.(SMEC)
CR NO.2051041620
Telephone:00966 3 8146 711
Fax:00966 3 8146522
Mob:+966 55 6006 729 (KSA)
    +86 135 8950 8858 (CHN)
E-mail:jinwenlin@yahoo.cn
Homepage:http://www.sypec.com.cn
Address:Crysantenpad 4# ,Eurovillage,
P.O.Box1682, Al Khobar 31952, KSA
Link