Sinopec Luoyang Branch 2 # Catalytic Cracking Unit FDFCC Renovation
The scope of the FDFCC retrofit project for the 2 # catalytic cracking unit of Sinopec Luoyang Branch includes all installation works except for civil foundation and indoor DCS, mainly including steel structure installation works, equipment installation works, pipeline installation works, electrical installation works, instrument installation works, waste heat boiler retrofit works, as well as corresponding dismantling works, anti-corrosion, insulation, lining, etc. The construction period is from March to June 2008.
|