Sinopec Luoyang Branch 2 # Catalytic Cracking Unit FDFCC Renovation

admin  2010-11-30   

  The scope of the FDFCC retrofit project for the 2 # catalytic cracking unit of Sinopec Luoyang Branch includes all installation works except for civil foundation and indoor DCS, mainly including steel structure installation works, equipment installation works, pipeline installation works, electrical installation works, instrument installation works, waste heat boiler retrofit works, as well as corresponding dismantling works, anti-corrosion, insulation, lining, etc. The construction period is from March to June 2008.


Luoyang Petrochemical Catalytic Unit Renovation Regenerator Ball Head Lifting


Construction of lining for FDFCC retrofit of 2 # catalytic cracking unit of Sinopec Luoyang Branch


Installation of FDFCC retrofit pipeline for 2 # catalytic cracking unit of Sinopec Luoyang Branch


Installation of FDFCC retrofit equipment for 2 # catalytic cracking unit of Sinopec Luoyang Branch


Lifting of FDFCC retrofit equipment for 2 # catalytic cracking unit of Sinopec Luoyang Branch


A Scenery of FDFCC Renovation of No.2 Catalytic Cracking Unit of Sinopec Luoyang Branch


A corner of the FDFCC retrofit unit for the 2nd catalytic cracking unit of Sinopec Luoyang Branch


 

Contact Us
Shengyue Middle East Co., Ltd.
Jin Wenlin,
General Manager,
Shengyue Middle East Co., Ltd.(SMEC)
CR NO.2051041620
Telephone:00966 3 8146 711
Fax:00966 3 8146522
Mob:+966 55 6006 729 (KSA)
    +86 135 8950 8858 (CHN)
E-mail:jinwenlin@yahoo.cn
Homepage:http://www.sypec.com.cn
Address:Crysantenpad 4# ,Eurovillage,
P.O.Box1682, Al Khobar 31952, KSA
Link