  The 120000 tons/year gas fractionation unit of the Fujian Refining and Ethylene Project of Sinopec Group is designed and procured by Sinopec Luoyang Petrochemical Engineering Company. The supervision unit is Hubei Sifang Engineering Construction Supervision Co., Ltd. Our company's scope of work includes all construction projects (excluding steel structure anti-corrosion), underground pipeline installation (including valve wells and inspection wells), anti-corrosion, grounding network engineering, installation and anti-corrosion construction of static equipment, dynamic equipment, process pipelines, electrical, telecommunications, instrumentation, and fire protection engineering inside the unit. The construction period is from January to June 2007.


Framework construction of 120000 ton gas fractionation unit for Fujian Refining Ethylene Project


Lifting of furnace wall panels for 120000 ton gas fractionation unit of Fujian Refining Ethylene Project


Equipment for insulation of 120000 ton gas fractionation unit in the construction of refining and ethylene project


Overview of the 120000 ton gas fractionation unit for the construction of the refining and ethylene project


Installation of equipment for the 120000 ton gas fractionation unit of the Refining and Ethylene Project


Tower lifting of 120000 ton gas fractionation unit for the construction of refining and ethylene project


Night view of the 120000 ton gas fractionation unit for the construction of the refining and ethylene project

 

Contact Us
Shengyue Middle East Co., Ltd.
Jin Wenlin,
General Manager,
Shengyue Middle East Co., Ltd.(SMEC)
CR NO.2051041620
Telephone:00966 3 8146 711
Fax:00966 3 8146522
Mob:+966 55 6006 729 (KSA)
    +86 135 8950 8858 (CHN)
E-mail:jinwenlin@yahoo.cn
Homepage:http://www.sypec.com.cn
Address:Crysantenpad 4# ,Eurovillage,
P.O.Box1682, Al Khobar 31952, KSA
Link